Concrete work below ground level

 

 

The dimensions of the house become visible

 

 

wooden formwork

 

   This wooden formwork is used to form concrete into a structural shape. It can be reused for other projects.

 

apply formwork

 

   We apply professional formwork below ground level and fill with concrete. The 22 foundations will point the forces of the whole house to underground.

 

 

 fill the pits and leveling

 

   The pits are refilled and the ground above is leveled with the help of our neighbor.

 

ring formwork above groundlevel

 

   The ring formwork above groundlevel connects the foundations to each other.

 

Ready mix

 

  

 

Ready mix

 

   Ready mix concrete produced off-site is delivered by a mixer truck. Enough help is available to unload and spread evenly. Btw when loading and mixing the truck the drum turns one direction, when unloading the drum turns in the other direction, it is all about fins inside the drum.

 

Ready mix

 

  

 

concrete is dry

 

  When concrete is dry the formwork is removed. After one to two days concrete has dried enough to walk on it. Actually full drying takes around a month. The warm weather also helps to proceed.

 

concrete is dry

 

  

 

 

 

Video Salon

 

 Jungle 
 Safety 
 Market 
 Food 
 Wine 
 X-mas 
 Cow 
 Fire 
 Solar 
 Hanoi 
 Fish 1 
 Fish 2 
 Puppy 
 Parade 

 

Thailand pictures and videos can be used and shared with others if the originated page is credited. For credit use this link: ThaiHome.pics Thank you! | Q&A

Content last change: July 15 2024