The foundation base

 

 

Transfer the weight to the ground

 

 

rebar delivery

 

   Rebar is delivered by a long truck. The rebar bars have a length of 12 meters and are bended for transport.

 

Rebar ironworkers

 

  Rebar ironworkers at work on site. Reinforcing bar (rebar) is used to strengthen the foundation’s concrete. Rebar is available in sizes from 8 to +40mm.

 

 

concrete in the pit

 

  One thin layer of concrete in the pit to prevent the concrete from disappearing in the ground and to keep the later formwork straight.The floor of the pit is at -1,65 meter below ground level.

 

 formwork is made from wood

 

  The formwork, the temporary moulds are made from wood and is the base for the shape of the foundation.

 

Before the first pole is erected

 

  Before the first pole is erected we bless the house and serve food. Unfortunately we can not have a Thai buddhist monk because our only driver is a woman. Monks can not drive together with women. We put some ornaments on top of the first two poles to celibate this step.

 

serving food

 

  

 

Ornaments on top of the pole

 

  Ornaments on top of the pole

 

secured bij wooden beams

 

   Poles are erected and secured by wooden beams. The formwork ist now filled with concrete.

 

base must dry

 

  It takes 24 to 48 hours for the new concrete to dry.

 

the concrete base must dry

 

  

 

 

 

Video Salon

 

 Jungle 
 Safety 
 Market 
 Food 
 Wine 
 X-mas 
 Cow 
 Fire 
 Solar 
 Hanoi 
 Fish 1 
 Fish 2 
 Puppy 
 Parade 

 

Thailand pictures and videos can be used and shared with others if the originated page is credited. For credit use this link: ThaiHome.pics Thank you! | Q&A

Content last change: July 14 2024