After the levels have been leveled, the preparations for the foundations can begin.
Global positioning for the fundaments is in place.
Measuring a foundation is done with simple tools. Floor markings are positioned exactly as a result. Positioning is done with a string and the Pythagorean theorem.
Kubota, a Japanese brand, at work. Digging the first hole, no artifacts to be seen.
A Kubota from the agricultural machinery company does the dry field work.
22 excavating pits in the ground to dig with an excavator for the foundations.
On the picture we see thin ropes to position the later fundaments related to each other. It is a very accurate task to do.
The digged holes from other direction.
Interesting to recoqnize the different levels in the digged hole. On top the layer we added by our self. The second layer is the original top soil from the land. The level below consists of red sand with little stones. It means water under foundation from rain can drain.
Thailand pictures and videos can be used and shared with others if the originated page is credited. For credit use this link: ThaiHome.pics Thank you! | Q&A